中国西部地区网络直报计算机装备项目的督导与评估

Supervision and evaluation of the project of the computer equipment for direct network report in the western China

  • 摘要: 目的 阐述中国西部地区传染病和应急突发事件网络直报计算机装备项目督导结果及相关问题讨论.方法 组织国家督导组,在每个项目省听取省级项目汇报,随机抽取4%项目点,采用电话调查及现场调查方式.结果 共抽取了90个地级单位中的220个县的640个项目点,其中现场调查133个、电话询问507个.现场调查合格率达90%,电话询问受客观条件不足的影响较大,合格率为60%.结论 项目总体情况良好,个别项目点存在设备分配不当,培训不到位的情况,西部省份的网络直报能力有很大提升,但其总体的信息化水平仍然偏低,需要继续扶持与改善.

     

    Abstract: Objective The purpose of this paper was to explain the results of the supervision of the project of computer equipment for direct network report on infectious diseases and public health emergency management in the western China, and to discuss the associated issues. Methods National supervision groups were organized and they went to the individual project provinces to listen to the reports on projects at the provincial level. Four percent of the project sites were randomly selected for telephone or field investigations. Results A total of 640 project sites in 220 counties of 90 prefectures and cities were selected and field investigations were made in 133 sites with telephone investigation done in 507 sites. The qualified rate of the project sites by field investigation was 90%, with a qualified rate of 60% by telephone investigation because of a significant influence of disadvantaged objective condition in telephone investigation. Conclusion Generally, the projects run smoothly except for an inappropriate equipment assignment or insufficient personnel training in one or two sites. The capacities of direct network report in the western regions advanced greatly after the accomplishment of the project, but the general level of informatization in the western China is still low and needs consistent support and improvement.

     

/